Rink Renovation Photos
Check out our progress.
https://cdn1.sportngin.com/attachments/photo/8437/3370/20170412_144003_thumb.jpg
-
Removing ice making machinery
-
Shaving the ice down for removal
-
Shaving the ice down for removal
-
Removing the ice sheet
-
Ice sheet completely removed
-
Removal of boards and glass
-
Removal of boards and glass
-
Boards and glass completely removed
-
Removing ice making machinery
-
Cutting the old rink floor in preparation for removal
-
Removing the concrete rink floor
-
Removing the concrete rink floor
-
Ice making machinery is almost gone
-
Removing the 3" of insulation under the rink floor
-
Rink floor is almost gone
-
Digging the new header trench
-
Old rink floor is completely removed
-
Pads for new refrigeration equipment
-
Installing new subfloor heating lines
-
subfloor heating is completely installed
-
Installing 5" sand for subfloor
-
Installing sand subfloor
-
5" sand subfloor completely installed
-
New pumps
-
Insulating main header trench
-
Insulation under the rink floor
-
Installation of refrigeration pipe supports and rebar
-
Receiving new chiller and compressors
-
Installing refrigeration piping
-
New compressors in place
-
U-bends at the ends of the refrigeration piping
-
Installing wire mesh over the refrigeration tube
-
Ready for concrete
-
Concrete day
-
Pouring the 5" concrete floor
-
Pouring the concrete floor
-
Finishing the concrete rink floor
-
Pouring the floor nearly complete
-
Rink floor is complete. Setting up for 14 day wet cure
-
Chiller and pumps in place
-
New pumps installed
-
Wiring the controls
-
Installing piping and conduit in the refrigeration room
-
Putting our green thumbs to work
-
New bushes for the grounds
-
Reinstalling the boards
-
-
-
-
After 3 coats of White paint
-
All painted and sealed in
-
-
Logo Installation
-
Logo is in